Allseas Hidden Gem
Part of the scope is:
- Modifying the 11Kv main switchboard
- Integrating a 2 step-down transformator (11kn/o,44Kv)
- Designing, building, supplying and integrating 440V switchgear and VFD’s
- Designing, building, supplying and integrating transformator containers
- Supplying 4 step-up transformators (0,44kV/6,6kV)
- Supplying 2 sep-up transformators (0,22kV/3,3kV)
- Supplying the cables incl. installation